|
Trix Express |
TRIX International |
From
Switzerland
Is
this the World’s largest Trix 3 rail layout ?
Updated
23 April 2006
Some photos will take a moment to
load !
|
|
|
|
Knubi Club Hans Isler, Oberortweg
8, 8804 Au, Switzerland |
300 meters of mainline Equivalent to 18 miles of scale track ! |
|
|
|
|
|
The name KNUBI Club, derives from the first letter of
the names of the 5 Trix enthusiasts who have built the layout. They are :-
|
|
|
|
|
Another visitor a TTR Princess in 2006
|
A visiting Coronation Scot passes over this
scratch built spectacular bridge |
|
|
|
|
The layout has taken 8 years to build so far, with most of the track finished.
|
The layout consists of a double mainline
winding through mountains and doubling back on itself many times. At each end
the train reverses to return down the other line. A train travelling at scale speed can take between 15 minutes
and 20 minutes before it returns to its starting position.
|
|
A view of the
mountain under construction |
A view in 2006
with the scenery added |
|
The whole layout
is controlled by an automatic train control block system. A small stud near the centre rail
activates a relay to close the block behind the loco. A magnet in the last car reverses the
relay to open the block. Numerous
trains can be run simultaneously |
|
|
|
A fun feature
is the TV camera mounted inside a coach which gives a track side view of the
line ahead as the engine pushes it in front . The picture is transmitted to a TV screen at the back of the
room. The room measures 36 feet by 25
feet or 11 meters by 8 meters. |
|
|
As scenery is added the layout is coming to
life |
A vital club meeting

Or
See more layouts from around the
World